SkyTrain, Düsseldorf Airport



Düsseldorf | Germany

The two 2.5 km-long tracks of the suspension railway connecting the railway station to the airport terminal were uneven. That made the journey uncomfortable, and increased wear on the chassis.
For this work, we designed and built two separate transport units our fitters used to travel with the milling units to the areas to be machined. We specially modified our milling machines to fit in the tight spaces inside the track supports (approx. 1,200 x 700 mm).